182
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
this post was submitted on 04 Sep 2024
182 points (90.6% liked)
Technology
59710 readers
1860 users here now
This is a most excellent place for technology news and articles.
Our Rules
- Follow the lemmy.world rules.
- Only tech related content.
- Be excellent to each another!
- Mod approved content bots can post up to 10 articles per day.
- Threads asking for personal tech support may be deleted.
- Politics threads may be removed.
- No memes allowed as posts, OK to post as comments.
- Only approved bots from the list below, to ask if your bot can be added please contact us.
- Check for duplicates before posting, duplicates may be removed
Approved Bots
founded 1 year ago
MODERATORS
The money was to build fabs, which they are still doing - which is costing them most of their money they struggle to afford because their current chips are awful.
Their fabs may be shit too. Hopefully the new ones are better
I mean how bad can the fabs be - they'll be running ASML EUV machines right?
I'm not sure the tool is the the issue here?
A master carpenter with entry level tools will still do a much better job than a klutz with professional grade tools.
Yes, a pro just needs some sand and a lighter and a needle
https://www.datacenterdynamics.com/en/news/intel-completes-assembly-of-high-na-euv-lithography-tool-at-oregon-fab/
They went through a phase where they were getting awful yields. No idea why they had those problems and others didn't.