We rode through on Sunday and, yeah, looks like a big project. I'm still not 100% sure what they're trying to do. Looks like improving the arrival and departure tracks?
this post was submitted on 14 Jun 2023
4 points (100.0% liked)
Portland
1129 readers
10 users here now
founded 5 years ago
MODERATORS
Looks like adding a second track:
add a second track to sections of the Red Line between the Gateway Transit Center and PDX, which TriMet says will improve system-wide reliability.
The timing seems questionable though. I'd think that any time other than our absolute peak travel season would have been better.
Construction in the mud would probably take even longer though.