10
submitted 3 months ago* (last edited 3 months ago) by NarrativeBear@lemmy.world to c/toronto@lemmy.ca

All we know is that the Eglinton LRT will not open for another three months, every day that Metrolinx does not give a defined opening date.

all 6 comments
sorted by: hot top controversial new old
[-] Cobrachickenwing@lemmy.ca 3 points 3 months ago

No real testing= no opening date. Phil Verster is just blowing hot air. He would do better telling us when Finch is opening.

[-] NarrativeBear@lemmy.world 2 points 3 months ago

Between line 3 just closing abruptly due to lack of maintenance, the Ontario Science Center closing abruptly due to lack of maintenance, Amsterdam Bridge along the waterfront closing due to lack of maintenance. I would not be supprised if Humber Bay Pedestrian Bridge is the next to go, its not been maintained in ages and looks close to end of life.

I think i see a pattern forming in Ontario in general. Ellington won't open anytime soon but most stations already look like they are lacking some maintenance as well.

[-] rbesfe@lemmy.ca 2 points 3 months ago

Phil Verster ruined Scotrail, then Metrolinx was like "that's the guy we want"

this post was submitted on 25 Jun 2024
10 points (100.0% liked)

Toronto

1611 readers
6 users here now

Toronto, Ontario, Canada

Friends:
Support lemmy.ca

founded 3 years ago
MODERATORS