2026-03-15:
- Pad 2 and B19: Testing continues. (NSF full livestream, NSF timelapse, ViX timelapse)
- LOX booster quick disconnect door is closed, as are both blast doors of the ground support equipment bunker. (ViX)
- Pad is clear, detonation suppression system is tested. (Avid Space)
- Road is closed. (Avid Space 1, Avid Space 2)
- Propellant loading begins. (Avid Space 1, Avid Space 2, TrackingTheSB 1, TrackingTheSB 2, NSF 1, NSF 2, Sorensen)
- B19 performs an igniter test. (NSF, Avid Space, TrackingTheSB 1, TrackingTheSB 2, Golden)
- B19 detanking. (Avid Space)
- Beach closures remain posted for Mar 16th through 18th, from 08:00 to 20:00. (starbase.texas.gov, archive, ViX, TrackingTheSB)
- Massey's Mar 13th addendum: Six of the tension rods were added to the structure which test tank S39.1 is resting on. (ViX)