621
The market is unpredictable
(lemmy.world)
General rules:
Exceptions may be made at the discretion of the mods.
2-3k to paint existing cabinets, new hardware 4-5k epoxy floor and countertops 4-5k new appliances 3-4k left for drywall, paint, lighting, trim, framing, hvac, plumbing, electrical.
She could have gotten more for less but not by much when you are hiring it all out. Doesn't even look like she touched the tile backsplash, which would be 1-2k more.
I remodel kitchens in the midwest, and we would charge a lot more than that for this size kitchen. She clearly didn't spend for a designer, though.
Damn, I should get into home improvement. I always did all that myself which is why my estimate was so low.
Plus that doesn't look like a terribly expensive stove or sink.
2-3K for paint?
You’re getting reamed by your painter if he’s charging you 2-3k for a small room like that.
I think that's an average professional price for my area, but there's always a cheaper painter. Spraying cabinets the right way is a big nasty job. Thankfully we don't do it much anymore.
I finish my own cabinets, so maybe I’m just out of touch. But materials alone is only like a hundred bucks or so, and a company already owns the compressor and paint sprayer. I don’t think I’d pay more than 1k, it better be fucking Van Gogh painting my cabinets for anything over that.
Wanna redo my kitchen for $15k? I'll hire you right now, and pay half up front.
I would honestly probably take that, but I highly doubt we live in the same area. I'd also practice on my own kitchen first, just to make sure I don't screw yours up.
Contractors charge a ton these days and it makes no sense to me. I'd hire out the countertops (one drop and I'm out $3k), but the rest would probably take 2 full days of work, plus maybe one or two partial days on either end for planning and cleanup/touchups. With less than half of that being parts (I think $7k is a decent high estimate), that would probably be like $300/hr, a little less if I rent tools instead of buying them.
I think contractors charge so much because work can be hit and miss, but if it's a side hustle, there's no reason to charge so much.