this post was submitted on 04 Jul 2026
141 points (98.6% liked)
Map Enthusiasts
6216 readers
1 users here now
For the map enthused!
Rules:
-
post relevant content: interesting, informative, and/or pretty maps
-
be nice
founded 3 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
Currently to have solar in the US, you need a permit from your electric utility. The process of granting that permit means utility engineering looks over your proposed solar setup, and determines if it will be safe for the grid if switched on.
Plug-in solar laws look to remove that permit process, but the engineering check still needs to be there so people don't plug in random shit and put others at risk of electrocution during outages. That's where UL steps in and requires all plug-in solar products to adhere to minimum safety standards.
Plug-in solar shifts the engineering burden from utilities to safety laboratories like UL. This means prosumers have an easier path to generating their own electricity, and utilities don't get bogged down with small prosumers that are only interconnecting single or double digit kWac arrays.