237
submitted 1 year ago* (last edited 1 year ago) by lntl@lemmy.ml to c/worldnews@lemmy.ml

Growth in german wind capacity is slowing. Soo... then the plan is to keep on with lignite and gas? Am I missing something?

Installed Wind Capacty - Germany

German Wind Capacity

you are viewing a single comment's thread
view the rest of the comments
[-] Ertebolle@kbin.social 2 points 1 year ago

Well now you're back to arguing about new construction instead of keeping existing plants running.

Also, we can build both. Surely you appreciate that there are other factors slowing the speed of the energy transition besides the availability of capital, and that while nuclear has its own roadblocks, many of them are different from + don't overlap or compete with those standing in the way of renewables.

[-] Blake@feddit.uk -2 points 1 year ago

Capital (money) and capital (political) are the only roadblocks between us and a 100% renewable future. So no, there's no value to wasting either of those on nuclear when they could be more wisely proportioned to renewables. Pretty much the only resource that nuclear consumes that isn't consumed by most renewables would be uranium. I'm willing to just go ahead and say we can leave that one in the ground.

[-] Ertebolle@kbin.social 3 points 1 year ago

They’re really not, and if you think that then you need to read more. And “political capital” isn’t some big fungible pool of quatloos, it’s a lot of little tiny stupid slow fights.

[-] Blake@feddit.uk 3 points 1 year ago

Okay, go ahead and list the resources used for building nuclear reactors that isn't used for building other renewables.

[-] derGottesknecht@feddit.de -2 points 1 year ago
  1. Uranium.

And thats about it.

this post was submitted on 02 Sep 2023
237 points (86.9% liked)

World News

32370 readers
684 users here now

News from around the world!

Rules:

founded 5 years ago
MODERATORS