this post was submitted on 14 Oct 2025
3 points (100.0% liked)

Rocket Lab

203 readers
3 users here now

A community for discussing Rocket Lab, the US/New Zealand aerospace company. All posts related to Rocket Lab are welcome.

Other space and rocket related communities:

founded 2 years ago
MODERATORS
 

Owl New World

| Scheduled for (UTC) | 2025-10-14 16:33 | |


|


| | Scheduled for (NZDT) | 2025-10-15 05:33 | | Launch site | Rocket Lab LC-1A, Māhia Peninsula, New Zealand | | Booster recovery | No | | Launch vehicle | Electron + Curie | | Customer | Synspective | | Payload | StriX satellite | | Mass | 100 kg | | Target orbit | Low Earth Orbit |

| Stream | Link | |


|


| | Rocket Lab (official) | https://www.youtube.com/watch?v=gkvby1Prnjs | | Space Affairs | https://www.youtube.com/watch?v=QiAkspCCq_g | | The Launch Pad | https://www.youtube.com/@TheLaunchPad/streams |

Stats

  • 15th launch for Rocket Lab this year.
  • 73th overall launch for Rocket Lab.

Payload info:

Rocket Lab mission page

NextSpaceflight:

StriX

This is the first of a bulk buy of 10 Electron launches by Synspective to deliver their StriX satellites to low Earth orbit. StriX satellites can collect data with a ground resolution of 1-3m and a swath width of more than 10-30km. Each Electron launch will deliver 1 StriX satellite into orbit. This will be the overall 7th StriX satellite launched by Rocket Lab for Synspective.


Previous mission: HASTE Justin

Next mission: The Nation God Navigates

Please post small launch updates, discussions, and questions here! Also feel free to leave feedback or suggestions for the mod team. We’re a relatively small community, so feedback is very valuable!

top 8 comments
sorted by: hot top controversial new old

Payload deploy confirmed!

Go no-go poll is complete, they are go for launch.

Battery hotswap confirmed.

MECO, stage separation, Rutherford vacuum engine ignition, and fairing jettison confirmed.

RocketLab webcast is live: https://www.youtube.com/watch?v=gkvby1Prnjs

This mission is using the custom "arrowhead" fairing to accommodate the shape of the satellite.

[–] threelonmusketeers@sh.itjust.works 1 points 5 months ago* (last edited 5 months ago)

SECO, nominal transfer orbit, and kickstage separation confirmed.

Curie engine ignition is scheduled for T+46:24.

Nominal Curie burn confirmed.