this post was submitted on 03 Feb 2026
10 points (91.7% liked)

NASA

1463 readers
10 users here now

Anything related to the NASA (National Aeronautics and Space Administration); the latest news, events, current and future missions, and more.

Note: This community is an unofficial forum and is unaffiliated with NASA or the U.S. government.

Rules

  1. Be respectful and inclusive.
  2. No harassment, hate speech, or trolling.
  3. Engage in constructive discussions.
  4. Share relevant content.
  5. Follow guidelines and moderators' instructions.
  6. Use appropriate language and tone.
  7. Report violations.
  8. Foster a continuous learning environment.

founded 2 years ago
MODERATORS
top 4 comments
sorted by: hot top controversial new old
[–] threelonmusketeers@sh.itjust.works 3 points 2 weeks ago (1 children)

Update: Artemis II launch is now NET March due to hydrogen leak identified during today's wet dress rehearsal.

https://x.com/NASAAdmin/status/2018578937115271660

Tweet textWith the conclusion of the wet dress rehearsal today, we are moving off the February launch window and targeting March for the earliest possible launch of Artemis II.

With more than three years between SLS launches, we fully anticipated encountering challenges. That is precisely why we conduct a wet dress rehearsal. These tests are designed to surface issues before flight and set up launch day with the highest probability of success.

During the test, teams worked through a liquid hydrogen leak at a core stage interface during tanking, which required pauses to warm hardware and adjust propellant flow. All core stage and interim cryogenic propulsion stage tanks were successfully filled, and teams conducted a terminal countdown to about T-5 minutes before the ground launch sequencer halted operations due to an increased leak rate. Additional factors included extended Orion closeout work, intermittent ground audio dropouts, and cold-weather impacts to some cameras, along with the successful demonstration of updated Orion closeout purge procedures to support safe crew operations.

As always, safety remains our top priority, for our astronauts, our workforce, our systems, and the public. As noted above, we will only launch when we believe we are as ready to undertake this historic mission.

This is just the beginning. It marks the start of an Artemis program that will evolve to support repeated and affordable missions to the Moon, in line with President Trump’s national space policy. Getting this mission right means returning to the Moon to stay and a future to Artemis 100 and beyond.

I want to thank the talented workforce at NASA, along with our industry and international partners, who are working tirelessly on this effort. The team will fully review the data, troubleshoot each issue encountered during WDR, make the necessary repairs, and return to testing. We expect to conduct an additional wet dress rehearsal and then target the March window.

We will continue to keep the public and the media informed as readiness progresses.

[–] burble@lemmy.dbzer0.com 2 points 2 weeks ago

Ouch. "Delay from hydrogen leaks" would probably be the free space on an Artemis bingo card.

[–] mech@feddit.org 0 points 2 weeks ago* (last edited 2 weeks ago) (1 children)

This is truly the space race 2.0:

After the Chinese have landed on the far side of the moon and the south pole for the first time ever, deployed rovers, returned tons of samples, have an ongoing mission on the surface since 2013, and deployed relay satellites to the Lagrange points, the US will drop some meat bags in suits 15 years later and declare themselves the winners.

My brother in Christ, dropping meatbags in suits on the moon and keeping them alive for long periods is a lot harder than rovers.

Besides, with china being capitalist, competition is what they want, right?