167
you are viewing a single comment's thread
view the rest of the comments
[-] SoJB@lemmy.ml 20 points 3 months ago* (last edited 3 months ago)

I feel like people outside industry don’t appreciate this message as much as intended.

Industrial switchgears, often part of an electric apparatus that looks like a giant metal box, have lead times measured in years. The supply chain is completely fucked.

A literal CEO of a $20billion company couldn’t skip the line despite writing them a letter and begging for any price.

Companies are paying long haul truckers expedited rates to haul a 53 foot trailer with a switchgear inside, and the rest of the trailer completely empty. Just to get it 2-3 days sooner, after their 1 year wait. You cannot operate the facility without it.

It really is a huge shame when one of them gets damaged.

this post was submitted on 15 Sep 2024
167 points (99.4% liked)

chapotraphouse

13599 readers
692 users here now

Banned? DM Wmill to appeal.

No anti-nautilism posts. See: Eco-fascism Primer

Slop posts go in c/slop. Don't post low-hanging fruit here.

founded 4 years ago
MODERATORS