this post was submitted on 19 Jun 2026
400 points (98.3% liked)

Steam Hardware

22453 readers
825 users here now

A place to discuss and support all Steam Hardware, including Steam Deck, Steam Machine, Steam Frame, and SteamOS in general.

As Lemmy doesn't have flairs yet, you can use these prefixes to indicate what type of post you have made, eg:
[Flair] My post title

The following is a list of suggested flairs:
[Deck] - Steam Deck related.
[Controller] - Steam Controller related.
[Machine] - Steam Machine related.
[Frame] - Steam Frame related.
[Discussion] - General discussion.
[Help] - A request for help or support.
[News] - News about the deck.
[PSA] - Sharing important information.
[Game] - News / info about a game on the deck.
[Update] - An update to a previous post.
[Meta] - Discussion about this community.

If your post is only relevant to one hardware device (Deck/Machine/Frame/etc) please specify which one as part of the title or by using a device flair.

These are not enforced, but they are encouraged.

Rules:

Link to our Matrix Space

founded 5 years ago
MODERATORS
 

Non-paywall link: https://archive.is/73XhB

top 50 comments
sorted by: hot top controversial new old
[–] sp3ctr4l@lemmy.dbzer0.com 96 points 1 week ago (11 children)

Well, on the one hand... having more demand than you can actually fulfill is the kind of problem most busineses would like to have...

[–] wander1236@sh.itjust.works 23 points 1 week ago (7 children)

Assuming they're actually moving a lot of units.

[–] sp3ctr4l@lemmy.dbzer0.com 7 points 1 week ago* (last edited 1 week ago)

I mean... even if they're not moving a lot of units, its still broadly a good problem to have -> considerably more people than you thought, want to buy the thing you sell.

So at bare minimum you've over delivered in terms of product design.

The extremely obvious capitalist response to that would be to raise prices on that thing. Win win, right? The extra profits go toward more capex to make more future production.

... But they haven't done that.

They haven't done that because they care about their image more than their profit margins on this particular product.

And/or because in the current environment... basically, the cost/reward on spending more capex isn't worth the reputation hit.

The capex spending to meaningfully ramp up production would be so expensive, that it'd end up being a net loss, in terms of reputation damage.

... At least this is my semi-informed guess.

load more comments (6 replies)
load more comments (10 replies)
[–] tuckerm@feddit.online 34 points 1 week ago (10 children)

Well, at least it's an update. I was just about to post in here if anyone had received a purchase link from their reservation yet. I made mine on May 10th; maybe that means I'll be in the "this year" batch.

[–] BCOVertigo@piefed.world 26 points 1 week ago (1 children)

Or maybe you'll get the link tomorrow and it will ship alarmingly fast like mine! ¯\(ツ)sBp7amhXoaMip0h.jpg

[–] MalReynolds@slrpnk.net 8 points 1 week ago* (last edited 1 week ago)

Yup, I got mine on day one (spam that F5 ppl) and it was here on the second day, surprised me, pleasantly, they said a week.

[–] lokalhorst@feddit.org 5 points 1 week ago

I made my reservation in the first minutes when it was possible and clicked the buying link as soon as I got one sent. The controller was delivered 10 days ago. I am located in Germany.

load more comments (8 replies)
[–] Reygle@lemmy.world 25 points 1 week ago (8 children)

Oh they're showing estimates now? Let's check.

:(

[–] bunnyBoy@pawb.social 9 points 1 week ago (1 children)

I put my order in about 30 minutes after the reservation queue went live and I also show a September estimated date. I'm interested, when did you get your reservation in?

[–] Reygle@lemmy.world 5 points 1 week ago* (last edited 1 week ago) (3 children)

I don't remember for sure, I think it was early afternoon that day?

Edit: Got the confirmation email from my reservation 1:10pm May 8th

load more comments (3 replies)
load more comments (7 replies)
[–] ech@lemmy.ca 24 points 1 week ago

"So behind"

They're dealing with exorbitant demand during a time when tech and hardware prices are skyrocketing. They're doing quite well given the circumstances, imo.

[–] Soulstorm@sh.itjust.works 18 points 1 week ago (1 children)

This worries me that this is foreshadowing the situation with the Steam Machine

[–] binux@sh.itjust.works 8 points 1 week ago* (last edited 1 week ago)

I have no doubt it is with the way the prices have been with memory and gas for a while now at this point. Not necessarily Valve’s fault, but it’s gonna suck ass regardless.

[–] Binturong@lemmy.ca 14 points 1 week ago (2 children)

What a curious way of saying this product is in very high demand, it's almost like the publication wants to project failure and perhaps even ill-will onto the vendor. Veeeeery interesting. Anyone seen Mr. Sweeney lately by the way?

[–] PrincessKadath@ani.social 6 points 1 week ago (1 children)

It's The Verge, what were you expecting?

load more comments (1 replies)
load more comments (1 replies)
[–] P1nkman@lemmy.world 14 points 1 week ago

I'm very happy I managed to snag one. For anyone waiting: it'll be worth it.

[–] Pavidus@lemmy.world 13 points 1 week ago (1 children)

I reserved on May 15th, and mine says 2027 ship date. "Some" is doing a lot of heavy lifting in that title.

[–] kbobabob@lemmy.dbzer0.com 8 points 1 week ago (1 children)

Seems valve really cocked up the launch if the first orders are going to take more than 6 months to fill.

[–] JohnEdwa@sopuli.xyz 5 points 1 week ago* (last edited 1 week ago)

They got the first shipment of manufactured controllers - one estimate is around 40k based on some import data - and sold them out in minutes, and started taking backorders.

[–] DosDude@retrofed.com 9 points 1 week ago

I can wait. There's no rush

[–] echodot@feddit.uk 7 points 1 week ago

I suspect that part of the problem is that they seem to have the steam machine bundled with the controller, or at least that seems to be an option. Presumably they're keeping some controllers back so they can fulfil those orders.

[–] frigge@lemmy.ml 6 points 1 week ago (2 children)

yay got my notification today. Reserved on the 8th. Just leaving this here as some hope to the people that haven’t received anythng yet

load more comments (2 replies)
[–] AceFuzzLord@lemmy.zip 5 points 1 week ago (12 children)

The longer the controller has been out, the less hyped I have become about it. At this point, I'm probably gonna end up in the future buying some other controller and calling it good.

Definitely need something better than my PowerA switch controller since I don't like how the triggers and bumpers are all or nothing, but I've basically lost all hype for a Steam controller.

load more comments (12 replies)
[–] drmoose@lemmy.world 5 points 1 week ago

Sad, mine is in 2027 and I got in on day 2 when they opened pre-orders as I missed initial announcement.

[–] tunetardis@piefed.ca 5 points 1 week ago (1 children)

My wife was supposed to get hers for Mother's Day. Now she's hoping Christmas? But even that's iffy at this point.

[–] Skullgrid@lemmy.world 6 points 1 week ago

"Your present is still being manufactured, please hold"

"Oh honey, I'll cherish this "Estimated Time of Shipping : Next May" email close to my heart whenever I need to feel appreciated for being a mother."

I hope she eventually enjoys it. I just wanted to make a joke of a shitty situation you ended up in.

load more comments
view more: next ›