this post was submitted on 15 Jul 2026
292 points (99.7% liked)

Fuck AI

7675 readers
801 users here now

"We did it, Patrick! We made a technological breakthrough!"

A place for all those who loathe AI to discuss things, post articles, and ridicule the AI hype. Proud supporter of working people. And proud booer of SXSW 2024.

AI, in this case, refers to LLMs, GPT technology, and anything listed as "AI" meant to increase market valuations.

founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] Kazumara@discuss.tchncs.de 4 points 3 days ago

I read about that site a little while ago! The datacenter is in Tennessee: https://maps.app.goo.gl/shpHnsqrQkz8g4cWA. And the power generation is one mile south, over the state border in Mississippi: https://maps.app.goo.gl/wR1e4YkqrhVcUJTi6. They built the datacenter (Colossus-2) in the building of a previous warehouse and the power plant on the site of a previous gas plant. Apparently they rent the gas turbines, that’s how they got them in place so quickly.

They are doing the same shitty trick as with Colossus-1 again, “those turbines are totally temporary and mobile, so we don’t need permits for a year”. MDEQ has confirmed for a while that there were 46 unpermitted turbines..

The real news in the Reuters report the Tomshardware article is based on, is that they got model numbers, and did the calculations for an estimate of the pollution. It's quite extreme, the size of those bars versus the line that displays the usual environmental limits.