843
top 41 comments
sorted by: hot top controversial new old
[-] toynbee@lemmy.world 65 points 2 days ago

When I was young, my mother showed me an educational book that had things like riddles, puzzles, and mental exercises in it. One of these entries had a short, mundane paragraph, followed by some form of "what was wrong with that text?"

It then explained that I had missed the word "the" being on the end of one line but also the start of the next line which, indeed, I did miss. It suggested that the human mind couldn't see duplicate words split in such a way, at least in English, unless actively looking for them.

I now know that, while it did trick me, its theory was incorrect ... Because I can't not see "from from."

[-] Wirlocke@lemmy.blahaj.zone 14 points 2 days ago

Maybe you built up antibodies cause I didn't notice at all.

[-] HootinNHollerin@lemmy.world 22 points 2 days ago* (last edited 2 days ago)

Perhaps you are the

the chosen one

[-] toynbee@lemmy.world 11 points 2 days ago
[-] Boxscape 2 points 1 day ago* (last edited 1 day ago)

That seems likely.

Spread the word!
Slap your theory on some linoleum tiles,
and deposit them on road surfaces.

[-] toynbee@lemmy.world 3 points 1 day ago

What, like some kind of toynbee tiles?

[-] Boxscape 1 points 1 day ago

What, like some kind of toynbee tiles?

Exactly!

🤣

[-] plactagonic@sopuli.xyz 77 points 3 days ago

My brother started working for company that makes these things and now he points every little detail on them.

"Look at this insulator" "Look these anchor points are made at factory I visited last week" ...

[-] pageflight@lemmy.world 29 points 3 days ago

I would subscribe to his YouTube channel!

[-] DogWater@lemmy.world 5 points 2 days ago

He does important work to keep railroads working I imagine then! I believe those are the tensioners for high voltage lines over trans and railways

[-] plactagonic@sopuli.xyz 5 points 2 days ago

Lol, mainly documentation and cad work. Dealing with architects if it is for trams or trolleybus lines, politicians and bureaucrats that makes the public orders and stuff like that.

[-] spankmonkey@lemmy.world 53 points 3 days ago
[-] expatriado@lemmy.world 33 points 3 days ago

double pulley, for added complexity

[-] Martineski@lemmy.dbzer0.com 6 points 3 days ago

Yeah, memes following the format with top and bottom text very often have repeating word as a joke.

[-] JackbyDev@programming.dev 11 points 2 days ago

Isn't this a tensioning device for an electric train?

[-] muntedcrocodile@lemm.ee 22 points 2 days ago* (last edited 2 days ago)

Its almost like we arw tought these things cos they have practical use cases.

[-] Liz@midwest.social 14 points 2 days ago

Clearly you weren't paying attention in English.

[-] boonhet@lemm.ee 1 points 2 days ago

It has no practical use cases.

[-] muntedcrocodile@lemm.ee 0 points 2 days ago

I was always better at maths. And dr gpt has solved the english issue.

[-] xChronoZerox@lemmy.today 10 points 2 days ago
[-] 21Cabbage@lemmynsfw.com 12 points 3 days ago

Looks like part of the tension system on a rope tow style ski lift.

[-] dragonfucker@lemmy.nz 4 points 2 days ago

Drag believes this is from an electric railway. The pulleys and weights keep the cable taut so the train can stay connected to it at high speeds.

[-] Iheartcheese@lemmy.world 14 points 3 days ago
[-] LegoBrickOnFire@lemmy.world 50 points 3 days ago* (last edited 3 days ago)

Those are things that regulate the tension in the overhead cables on train tracks. With the variation of temperature cables tend to contract/expand and this systems allows the cables to do so freely with a constant tension provided by the weights.

[-] verstra@programming.dev 22 points 3 days ago

These are so simple and yet so clever. When i noticed them the first time i started noticing them everywhere (on all rail infrastructure).

[-] RubberElectrons@lemmy.world 5 points 3 days ago

I as well. Seattle transit, NEC Amtrak and NJ transit live off of these. If these systems work for them, they'll work for us all

[-] someacnt_@lemmy.world 1 points 2 days ago

Is it simple? It looks quite complicated, but maybe that's just me forgetting how to compute forces.

[-] Swedneck@discuss.tchncs.de 3 points 2 days ago

simple in that it's just a clever series of wires and pulleys, not some sort of digital adjustment device, i suppose

[-] verstra@programming.dev 1 points 2 days ago

Also, you are looking at a few different wires at once here. Each separate wire is tensioned with a mechanism with a few moving parts.

[-] Iron_Lynx@lemmy.world 5 points 2 days ago

In case people don't want to click a link, let me explain it here:

If you want to use overhead line electrification, you need to suspend a wire over the rails. In theory, you could simply hang up a wire, but whichever amount of tension you choose, if it's warmer outside, the wire will droop, potentially causing damage, while if it's colder outside, the wire will pull taut and may snap. So you want a system to account for external temperature.

Instead of picking a tension at a standard installation temperature, you pick an amount of desired tension and use weights to pull it taut. Now, if the wire heats up and extends, the weights drop, and if the wire cools down and contracts, the weights are pulled up.

And to keep the amount of weight you need to add under control, you use a series of pulleys to control the tension in the wire.

In NL, the mainline system looks a lot simpler: They have only one wheel, but that's two pulleys: a larger one and a smaller one. The larger one holds the weight, while the smaller one holds the wires.

[-] Iron_Lynx@lemmy.world 3 points 2 days ago

With the previous ELI12 under control, let's ELI>12 overhead line catenary a little more. For instance, why do you need tension in the first place?

Fact of the matter is that using a rigid conductor is problematic with high voltage AC (skin effect and such), plus it's more visually intrusive than wires. Meanwhile, a wire will sag, regardless of how much tension you can practically apply. So you need a few devices to help keep the wire at height.

For one, the wire is supported every few dozen metres. Secondly, there's a second wire strung above the first one. And while both wires are pulled taut, there are dropper wires between the upper and lower wires, which vary in length. Longer near the poles, while at the shortest near the middle between two poles, which creates a structure similar to a suspension bridge to keep the contact wire within a tight margin of vertical space.

[-] IndustryStandard@lemmy.world 2 points 3 days ago

The train duh

[-] Anticorp@lemmy.world 8 points 2 days ago

Yes, this is why we study physics.

[-] jafffacakelemmy@mander.xyz 10 points 3 days ago

Catenary is the magic word here

[-] perviouslyiner@lemmy.world 5 points 3 days ago

And the weights are like a bigger version of the weight-hangers from science classes.

this post was submitted on 24 Nov 2024
843 points (98.6% liked)

Science Memes

11173 readers
2320 users here now

Welcome to c/science_memes @ Mander.xyz!

A place for majestic STEMLORD peacocking, as well as memes about the realities of working in a lab.



Rules

  1. Don't throw mud. Behave like an intellectual and remember the human.
  2. Keep it rooted (on topic).
  3. No spam.
  4. Infographics welcome, get schooled.

This is a science community. We use the Dawkins definition of meme.



Research Committee

Other Mander Communities

Science and Research

Biology and Life Sciences

Physical Sciences

Humanities and Social Sciences

Practical and Applied Sciences

Memes

Miscellaneous

founded 2 years ago
MODERATORS